How we run a new project
Fictional example: we use a plant handling scenario to explain surveying, design and installation. The story and figures are illustrative.
On the first day we walk the plant.
We follow the material from goods-in to dispatch. Together with the prospective client, we agree the route and the most suitable loading and unloading points. We survey the building, existing steel structures and any obstacles.
On to the surveyWe map how the material moves.
Using the current workflows and routes, we prepare an equipment layout showing the loading and unloading points.
On to the bottleneckPallets pile up in front of assembly.
Pallets wait in front of the assembly line, the forklift has to queue, and parts are lifted across by hand. This is where most time can be saved.
On to the proposalOur proposal: an overhead conveyor above the aisle.
Based on the survey, we prepare a preliminary design covering the overhead conveyor, steel structure and loading and unloading units. We send it with our quotation. Before a decision is made, we can revise the design to include requested changes that are technically feasible.
On to the buildWe design, build and install it.
We complete the detailed design, then begin fabrication. We provide full manufacturing documentation and can also handle fabrication and on-site installation. We plan the work to minimise disruption to existing production.
On to handoverHandover, training and maintenance
We commission the system, hand over the documents and train the operators. You can count on us later for maintenance or extensions too. The project shown is a made-up example; the way we work is real.
Four phases of a project.
At the end of each phase, we deliver something that can help you make a decision.
-
Walk-through and survey
We survey the task and site, take measurements, and discuss the problem areas and what needs to be resolved.
- Layout planning
- Site photos and measurements
- Resolving the bottleneck
-
Concept and quote
We prepare a preliminary equipment design and attach a quotation. If needed, we can provide several design and quotation options.
- Presenting 3D and 2D preliminary designs
- Consultation if there are several options
- Final quotation and installation schedule
-
Design and fabrication
We create a detailed 3D model and manufacturing documentation. Where required, we also provide structural calculations and documents. We fabricate and trial-assemble the steel structures and mechanical components in our own workshop.
- Manufacturing documentation
- Structural documentation
- Fabrication and trial assembly
-
Installation, handover and maintenance
Staged installation next to running production, commissioning and training. We stay on afterwards: maintenance, extensions, changes.
- Manual and CE documents
- Operator training
- Maintenance agreement
Where does material get stuck in your plant?
We start with a walk-through, then tell you what we suggest and what it costs.